SCS 770153 SW Aware Monitor Verification Tester
Product Info
The SCS 770153 SW Aware Monitor Verification Tester is specifically designed to perform periodic verification of the SW Aware Monitor every 6 to 12 months without removing it from the factory floor.
Per ANSI/ESD S20.20 section 7.3, compliance verification records shall be established and maintained to provide evidence of conformity to technical requirements. The SCS 770153 Verification Tester enables users to confirm that the SW Aware Monitor's continuous impedance sensing circuits are functioning within specification, satisfying periodic verification requirements. Because the SW Aware Monitor uses impedance sensing technology - not standard DC resistance measurement - this dedicated tester is required; standard DC test equipment cannot verify the monitor's test limits. Refer to user guide TB-9125 for detailed calibration and verification procedures.
Benefits & Features of the SW Aware Monitor Verification Tester:
- Verifies SW Aware Monitor Test Limits Without Removing from Factory Floor
- Performs Periodic Verification Every 6 to 12 Months as Recommended by SCS
- Checks Both Operator and Worksurface Monitor Circuits
- Made in the United States of America
- Compact and Portable for on-Site Use
- Compatible Exclusively with SCS SW Aware Monitor (770151 and 770152)
- Made in the United States of America
SW Aware Monitor Verification Tester
Item Specifications
-
461821
-
0.65 lbs per EA
